Loading...
Loading...
Nobody is listening yet. This is the three-minute story of what changes when you can hear it.
The machine knew 40 minutes before anyone did. Vibration drifted, temperature crept, cycle time stretched. None of it reached a person until it was a stoppage.
Three buildings away, in handwriting, with a signature from a shift that ended at six. Audit week is a fortnight of searching for paper you already have.
Then the trace begins: which lot, which shift, which parameter. Without unit-level genealogy you recall the lot. All of it.
Assumes ~2.3 unplanned stops a week, which is conservative for a mixed line. The point is not the exact figure. It is that the figure was knowable 40 minutes earlier.
Orders in progress, inspection pass rate, work-centre activity and everything that needs a decision: overdue orders, open non-conformances, maintenance plans. The morning meeting starts with facts, not photos of HMI screens.

EFM ships AI agents that read the same MES records your engineers do. One explains downtime with evidence. One re-plans the shift when reality changes. Both show their working, and both wait for a human before anything moves.
Shift plan as released. Seven orders across four work centres, takt on target.
Same machine, same bearing. The only difference is who heard it first.
Bearing vibration on Press 01 crosses its learned baseline. The edge model scores it 0.81.
EFM raises a predictive-maintenance alert and a work order on the edge node. No cloud involved.
The twin re-sequences 42 parts to the CNC buffer. Takt is protected at −4%.
Maintenance is paged with the part number. The bearing swap is booked for the planned window.
Day shift reads the whole thing in the morning report. Nobody searched for a binder.
You don’t. EFM runs beside what you have, reads what the PLCs already say, and starts with one line. A pilot takes two weeks.
That is the premise. Execution, models and records live on an edge node in the plant. When the internet drops, the line does not notice.
It doesn’t have to. The edge node is the system of record. What syncs upward is your choice, field by field.
So do most of our customers. Native bridges for MII, ME and Digital Manufacturing keep SAP as the ERP truth while execution moves to the edge.
A 30-minute walkthrough on your process, not a slide deck. If it is a fit, one cell runs on an EFM edge node within two weeks.